Skip to main content
Loading

Pushing the boundaries in Geothermal, CO2 and Multistage Completion Settings

Tuesday, 24 September
Room 215 - 216
Technical Session
This session encompasses case studies, material and tool development as well as design optimizations across a variety of completion system installments, multilateral wells, CCS and enhanced geothermal systems
Session Chairpersons
Ergun Kuru - University of Alberta
Gabrijel Grubac - Blade Energy Partners
Peter Janiczek - OMV Petrom SA
  • 0830-0855 220758
    Development of Multi-Stage Fracturing System and Wellbore Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores - Third Year Progress Report
    W.W. Fleckenstein, H. Kazemi, J. Miskimins, A. Eustes, D. Abdimaulen, B. Mindygaliyeva, O. Uzun, K. Amini, Colorado School of Mines; T. Hill, Tejas Research and Engineering; J. Mailand, R.C. Henschel, Tejas Research & Engineering; G.R. King, S.D. Ortiz, KSWC-HERCON Inc; C. Keyes, Defiant Engineering LLC
  • 0855-0920 221040
    Cost-effective Sealing Of Geothermal Wells By Modifying Existing Elastomers
    S. Liu, A. Dahi Taleghani, The Pennsylvania State University
  • 0920-0945 220794
    Development and Qualification of a High Angle Multi-Frac (HAMF) Completion System for Deepwater Subsea Wells
    S. Vitthal, Shell International E&P Co.; A. Goncu, Shell E&P International Ltd; V. Spencer, Shell Oil Co.; I. Jackson, Shell Exploration and Production Co; X. Xiao, Shell; C.Y. Song, Shell Exploration & Production Co; M. Vanee, B. Cheeseman, NCS MultiStage
  • 1015-1040 220769
    Advanced Integration Of Coiled Tubing Optical Telemetry, Multilateral Tools, And Retarded Acid Systems In A Level Four Six-legged Multi-lateral Oil Producer - A Comprehensive Case Study From North Kuwait Field
    M. Slama, SLB; M.A. Al-Matar, Kuwait Oil Company; K. Badrawy, R. Sunagatov, SLB; N. Molero, Schlumberger Saudi Arabia; J. Barki, Z. Al-Bahar, F.M. Bastaki, M. Omar, Kuwait Oil Company; V. Pochetnyy, M. Adel Sebaih, S. Rondon Fajardo, SLB; M. Jamal, F. Al-Mutairi, Kuwait Oil Company
  • 1040-1105 220702
    Co2 Injection Well Design Considerations: Completion Design To Injectivity Analysis
    A.S. Bagci, A. Jonnalagadda, Baker Hughes; D. Hernandez-Diaz, Baker Hughes RDS
  • 1105-1130 220775
    Barrier Design And Evaluation Process To Achieve Cement Integrity In CCS Wells
    S. Jandhyala, S. Lewis, Halliburton Energy Services Inc.
  • Alternate 220947
    Enhancing CO2 Injector Well Performance With GRE Lined Tubing: A Technical Evaluation
    M. Bin Ismail, Petronas Carigali Sdn Bhd; M. Moh Wahi, Petronas; M. Lokman, Petronas Carigali Sdn Bhd; M. Ebining Amir, Petronas; M. Omar, MaxTube Ltd.; A. Fernandes, Maxtube
  • Alternate 220944
    Digital Twin For Optimization Of Wells With Intelligent Completion
    S. Srivastava, A. Gambaretto, K. Shresth, SLB